Overview

The Contractor of Choice

The Industrial Group provides a comprehensive range of services for industrial plants and facilities. ARB is experienced in power generation, renewable energy and energy storage, the refinery and chemical industries, water and wastewater, oil and gas, and alternative fuels. We are a leader in performing difficult fast track projects. Services include full EPC project delivery, turnkey construction, retrofits, upgrades, repairs, outages, and maintenance.

The Industrial Group has built a reputation as the contractor of choice as evidenced by decades-long relationships with a diverse clientele; including major oil companies, investor-owned utilities, midstream transportation companies, and independent power producers.

About Us

Our focus on heavy industrial projects encompasses constructability review during early project development all the way through engineering, procurement, and construction.

Our portfolio of successful projects includes those constructed in partnership with major engineering firms, providing turnkey solutions for the client and single-point responsibility from the outset of project development through start-up and commissioning. ARB routinely self-performs all aspects of project construction with our large base of direct-hire craft, seasoned site supervision, and project managers.

We provide value to our customers with superior technical competence and innovation, responsiveness and accessibility to top management levels, industry-leading safety and quality performance, and a genuine concern for our client's needs at every level of our organization.

Projects

Carlsbad Energy Center
ARB in a joint venture had EPC responsibility for a five (5)...
Carlsbad, CA

Carlsbad Energy Center

ARB in a joint venture had EPC responsibility for a five-unit, GE LMS100-PA, natural gas fueled, air-cooled, Simple Cycle Combustion Turbine, with catalytic emission controls. It is a brownfield, peaking generating station inter-tied with SDG&E on their 138kV and 230kV transmission systems adjacent to the existing Encina Generating Station. The power island equipment, procured by the plant owner NRG, is assigned to the EPC. As the EPC we are providing the BOP equipment, full detail design development, construction services, and plant commissioning, with overall performance and project schedule delivery certainty.

ARB in a joint venture had EPC responsibility for a five-unit, GE LMS100-PA, natural gas fueled, air-cooled, Simple Cycle Combustion Turbine, with catalytic emission controls. It is a brownfield, peaking generating station inter-tied with SDG&E on their 138kV and 230kV transmission systems adjacent to the existing Encina Generating Station. The power island equipment, procured by the plant owner NRG, is assigned to the EPC. As the EPC we are providing the BOP equipment, full detail design development, construction services, and plant commissioning, with overall performance and project schedule delivery certainty.

ARB in a joint venture had EPC responsibility for a five-unit, GE LMS100-PA, natural gas fueled, air-cooled, Simple Cycle Combustion Turbine, with catalytic emission controls. It is a brownfield, peaking generating station inter-tied with SDG&E on their 138kV and 230kV transmission systems adjacent to the existing Encina Generating Station. The power island equipment, procured by the plant owner NRG, is assigned to the EPC. As the EPC we are providing the BOP equipment, full detail design development, construction services, and plant commissioning, with overall performance and project schedule delivery certainty.

El Segundo Energy Center
Replacement of the existing El Segundo Generating Station...
El Segundo, CA

El Segundo Energy Center

Replacement of the existing El Segundo Generating Station (ESGS) Units 1 and 2 with a natural gas-fired combined cycle electric generation facility. The new combined cycle is designed to generate 550 megawatts (MW) under nominal conditions. The project used Selective Catalytic Reduction (SCR), a dry, low NOx combustor and an oxidation catalyst system to reduce air emissions. Construction of concrete foundations, electrical duct banks, all piping systems, two Siemens gas turbines each with a single pressure HRSGs and two Siemens steam turbines with air cooled condensers. Four GSUs, auxiliary transformers, electrical rooms, gas compressors, and other required Balance of Plant (BOP) support equipment.

Replacement of the existing El Segundo Generating Station (ESGS) Units 1 and 2 with a natural gas-fired combined cycle electric generation facility. The new combined cycle is designed to generate 550 megawatts (MW) under nominal conditions. The project used Selective Catalytic Reduction (SCR), a dry, low NOx combustor and an oxidation catalyst system to reduce air emissions. Construction of concrete foundations, electrical duct banks, all piping systems, two Siemens gas turbines each with a single pressure HRSGs and two Siemens steam turbines with air cooled condensers. Four GSUs, auxiliary transformers, electrical rooms, gas compressors, and other required Balance of Plant (BOP) support equipment.

Replacement of the existing El Segundo Generating Station (ESGS) Units 1 and 2 with a natural gas-fired combined cycle electric generation facility. The new combined cycle is designed to generate 550 megawatts (MW) under nominal conditions. The project used Selective Catalytic Reduction (SCR), a dry, low NOx combustor and an oxidation catalyst system to reduce air emissions. Construction of concrete foundations, electrical duct banks, all piping systems, two Siemens gas turbines each with a single pressure HRSGs and two Siemens steam turbines with air cooled condensers. Four GSUs, auxiliary transformers, electrical rooms, gas compressors, and other required Balance of Plant (BOP) support equipment.

Los Angeles Refinery Integration and Compliance (LARIC)
ARB Industrial was awarded the LARIC project by Andeavor...
Carson, CA

Los Angeles Refinery Integration and Compliance (LARIC)

ARB Industrial was awarded the LARIC project by Andeavor Refining and Marketing. The scope of work included HDD at two locations to accommodate a 33-inch pipe bundle to connect two refineries into one, underground piping, 2 metering and pigging stations, 900 cubic yards of concrete, 22 trap and meter skid sets, and 4,000 linear feet of piping.

ARB Industrial was awarded the LARIC project by Andeavor Refining and Marketing. The scope of work included HDD at two locations to accommodate a 33-inch pipe bundle to connect two refineries into one, underground piping, 2 metering and pigging stations, 900 cubic yards of concrete, 22 trap and meter skid sets, and 4,000 linear feet of piping.

ARB Industrial was awarded the LARIC project by Andeavor Refining and Marketing. The scope of work included HDD at two locations to accommodate a 33-inch pipe bundle to connect two refineries into one, underground piping, 2 metering and pigging stations, 900 cubic yards of concrete, 22 trap and meter skid sets, and 4,000 linear feet of piping.

Kinder Morgan Multiple Projects
ARB Industrial has a long term relationship with Kinder...
California

Kinder Morgan Multiple Projects

ARB Industrial has a long term relationship with Kinder Morgan. This long standing relationship has continued to perform ongoing small capital projects throughout California for DOT hydrotesting, emergency call out service/repairs, and routine maintenance. In addition to this work, ARB has performed capital projects to include a large scale tank project, new product services as well as design support. ARB continues to standby this long term partnership with Kinder Morgan.

ARB Industrial has a long term relationship with Kinder Morgan. This long standing relationship has continued to perform ongoing small capital projects throughout California for DOT hydrotesting, emergency call out service/repairs, and routine maintenance. In addition to this work, ARB has performed capital projects to include a large scale tank project, new product services as well as design support. ARB continues to standby this long term partnership with Kinder Morgan.

ARB Industrial has a long term relationship with Kinder Morgan. This long standing relationship has continued to perform ongoing small capital projects throughout California for DOT hydrotesting, emergency call out service/repairs, and routine maintenance. In addition to this work, ARB has performed capital projects to include a large scale tank project, new product services as well as design support. ARB continues to standby this long term partnership with Kinder Morgan.

Salt River Project
The Salt River Project (SRP) Near Term Capacity Projects...
Arizona

Salt River Project

The Salt River Project (SRP) Near Term Capacity Projects (NTC) each rated at 99 MW at two of its existing generating facilities. The two existing sites are Agua Fria and Desert Basin. Each NTC Site features two General Electric LM6000PC Units complete with an Inlet Air Filter, Evaporative Cooler and SCR/CO catalyst for emissions control (includes duct work, ammonia vaporization skid, tempering air fans and exhaust ducts), two 100% Fuel Gas Compressors (Agua Fria only), one natural gas conditioning skid, a three winding Generator step-up transformer, one Power Control Module, one Balance of Plant (BOP) Power Distribution Center (PDC), UAT’s and associated BOP equipment. ARB is performing the EPC construction of both facilities.

The Salt River Project (SRP) Near Term Capacity Projects (NTC) each rated at 99 MW at two of its existing generating facilities. The two existing sites are Agua Fria and Desert Basin. Each NTC Site features two General Electric LM6000PC Units complete with an Inlet Air Filter, Evaporative Cooler and SCR/CO catalyst for emissions control (includes duct work, ammonia vaporization skid, tempering air fans and exhaust ducts), two 100% Fuel Gas Compressors (Agua Fria only), one natural gas conditioning skid, a three winding Generator step-up transformer, one Power Control Module, one Balance of Plant (BOP) Power Distribution Center (PDC), UAT’s and associated BOP equipment. ARB is performing the EPC construction of both facilities.

The Salt River Project (SRP) Near Term Capacity Projects (NTC) each rated at 99 MW at two of its existing generating facilities. The two existing sites are Agua Fria and Desert Basin. Each NTC Site features two General Electric LM6000PC Units complete with an Inlet Air Filter, Evaporative Cooler and SCR/CO catalyst for emissions control (includes duct work, ammonia vaporization skid, tempering air fans and exhaust ducts), two 100% Fuel Gas Compressors (Agua Fria only), one natural gas conditioning skid, a three winding Generator step-up transformer, one Power Control Module, one Balance of Plant (BOP) Power Distribution Center (PDC), UAT’s and associated BOP equipment. ARB is performing the EPC construction of both facilities.

Stanton Energy Reliability Center (SERC) - 98MW
The project is comprised of two simple-cycle generating...
Stanton, CA

Stanton Energy Reliability Center (SERC) - 98MW

The project is comprised of two simple-cycle generating facilities consisting of two General Electric (GE) LM6000 hybrid enhanced gas turbine (Hybrid EGT®) systems. The Hybrid EGT® combines a combustion gas turbine with an integrated battery storage component operated by a proprietary software system. The integrated system will be capable of providing synchronous condensing, greenhouse gas-free spinning reserve, high-speed regulation, primary frequency response, and voltage support with the combined response of the gas turbine and battery storage system. This design supports the move toward greater renewable energy in the CAISO energy market.

The project is comprised of two simple-cycle generating facilities consisting of two General Electric (GE) LM6000 hybrid enhanced gas turbine (Hybrid EGT®) systems. The Hybrid EGT® combines a combustion gas turbine with an integrated battery storage component operated by a proprietary software system. The integrated system will be capable of providing synchronous condensing, greenhouse gas-free spinning reserve, high-speed regulation, primary frequency response, and voltage support with the combined response of the gas turbine and battery storage system. This design supports the move toward greater renewable energy in the CAISO energy market.

The project is comprised of two simple-cycle generating facilities consisting of two General Electric (GE) LM6000 hybrid enhanced gas turbine (Hybrid EGT®) systems. The Hybrid EGT® combines a combustion gas turbine with an integrated battery storage component operated by a proprietary software system. The integrated system will be capable of providing synchronous condensing, greenhouse gas-free spinning reserve, high-speed regulation, primary frequency response, and voltage support with the combined response of the gas turbine and battery storage system. This design supports the move toward greater renewable energy in the CAISO energy market.

Hydrogen Home Project
The Hydrogen Home project scope includes construction of the...
Downey, CA

Hydrogen Home Project

The Hydrogen Home project scope includes construction of the nation’s first green hydrogen microgrid demonstration project. The project consists of installing 70 KW of PV solar, battery storage, a deionized water skid, chiller, hydrogen electrolyser, storage tank, fuel cell, and a blending skid to blend up to 20% hydrogen with natural gas for use in gas appliances.
The Hydrogen Home project scope includes construction of the nation’s first green hydrogen microgrid demonstration project. The project consists of installing 70 KW of PV solar, battery storage, a deionized water skid, chiller, hydrogen electrolyser, storage tank, fuel cell, and a blending skid to blend up to 20% hydrogen with natural gas for use in gas appliances.
The Hydrogen Home project scope includes construction of the nation’s first green hydrogen microgrid demonstration project. The project consists of installing 70 KW of PV solar, battery storage, a deionized water skid, chiller, hydrogen electrolyser, storage tank, fuel cell, and a blending skid to blend up to 20% hydrogen with natural gas for use in gas appliances.
 

HEADQUARTERS

Lake Forest Office
26000 Commercentre Drive
Lake Forest, CA 92630
Phone: 949.598.9242

Find us on a map


 
Bakersfield Office
3500 Pegasus Drive
Bakersfield, CA 93308
Phone: 661.833.4400

Pittsburg Office
1875 Loveridge Road
Pittsburg, CA 94565
Phone: 925.432.3563