Overview

The Contractor of Choice

Since 1923, we've been committed to providing excellent service, leveraging our extensive experience in construction, maintenance, and fabrication.

Primoris Canada

We have built a strong reputation centered on our dedicated people, exceptional safety performance, quality of work, and drive to continually improve the value we provide to our clients.

About Us

Headquartered in Acheson, AB with a regional office in Fort McMurray, AB, we completed our first project over a century ago and have grown to become a leading solutions provider within the Western Canadian market.

Our wide range of services include:

Civil Civil

Piling Piling

Mechanical Mechanical

Pipeline Pipeline

Tank Tank

Fabrication Fabrication

Electrical Electrical

Instrumentation Instrumentation

Across our expansive services, our team is committed to supporting our exceptional clients as they maintain and develop the energy mix of today and tomorrow.

We take pride in delivering quality work while meeting deadlines and maintaining exceptional safety performance. Our teams are equipped for success and provide value to our clients through continuous best practice training and professional development. As a collaborative contractor, our clients know that when they choose to partner with us, they are setting their project up for success.

Click [here] to download a PDF of our brochure.

Projects

World Scale Fired Heaters
Primoris Canada was awarded the construction contract to...
Confidential

World Scale Fired Heaters

The scope consisted of erecting 4 world-scale fired heaters including 4 x twin cell radiant sections with shared convection sections and stacks, 120 burners to produce a duty of close to 400 MMBtu, modularization of the radiant boxes, installation of radiant coils on each cell, 25 levels of platforms, and ~2,100 LM of fuel gas supply lines. Critical lift plans with the use of 650- ton cranes and aerial
work platforms.

The scope consisted of erecting 4 world-scale fired heaters including 4 x twin cell radiant sections with shared convection sections and stacks, 120 burners to produce a duty of close to 400 MMBtu, modularization of the radiant boxes, installation of radiant coils on each cell, 25 levels of platforms, and ~2,100 LM of fuel gas supply lines. Critical lift plans with the use of 650- ton cranes and aerial work platforms.

The scope consisted of erecting 4 world-scale fired heaters including 4 x twin cell radiant sections with shared convection sections and stacks, 120 burners to produce a duty of close to 400 MMBtu, modularization of the radiant boxes, installation of radiant coils on each cell, 25 levels of platforms, and ~2,100 LM of fuel gas supply lines. Critical lift plans with the use of 650- ton cranes and aerial work platforms.

Kearl Fine Tailings Treatment (KFTT)
Primoris Canada constructed 18 pipeline systems totaling...
Edmonton, AB, Canada

Kearl Fine Tailings Treatment (KFTT)

Construction of 18 pipeline systems totaling 36km and ranging in diameter from 14” to 48”. Most systems consisted of heavy wall carbon steel material (>.500”) and included 48” KEP & KID RCW Lines, 24” Pond 6 Discharge Line, 36” Pond 4/5 Discharge Lines, 30” KFTT IP and LP Lines, 14” & 16” Flotation Thickener Underflow Lines, 24” KFTT TSRU Line, 36” & 48” KFTT Water Transfer, a total of 850m Road crossing Auger Boring, and a total of 3,700m of road crossings.

Construction of 18 pipeline systems totaling 36km and ranging in diameter from 14” to 48”. Most systems consisted of heavy wall carbon steel material (>.500”) and included 48” KEP & KID RCW Lines, 24” Pond 6 Discharge Line, 36” Pond 4/5 Discharge Lines, 30” KFTT IP and LP Lines, 14” & 16” Flotation Thickener Underflow Lines, 24” KFTT TSRU Line, 36” & 48” KFTT Water Transfer, a total of 850m Road crossing Auger Boring, and a total of 3,700m of road crossings.

Construction of 18 pipeline systems totaling 36km and ranging in diameter from 14” to 48”. Most systems consisted of heavy wall carbon steel material (>.500”) and included 48” KEP & KID RCW Lines, 24” Pond 6 Discharge Line, 36” Pond 4/5 Discharge Lines, 30” KFTT IP and LP Lines, 14” & 16” Flotation Thickener Underflow Lines, 24” KFTT TSRU Line, 36” & 48” KFTT Water Transfer, a total of 850m Road crossing Auger Boring, and a total of 3,700m of road crossings.

Syncrude Tailings Relocation North Mine South Pit East P1
Primoris Canada provides pipeline installs on systems 1, 3...
Alberta, Canada

Syncrude Tailings Relocation North Mine South Pit East P1

Phase 1 System 1, 3 and 4 Modifications. Pipeline install and Wye Switch Installs including installation of ~3km CS sleeves and culverts of various diameters, ~1km of 36” A/G piping, ~ 2.4 km of Road Crossings, ~1.1km of 42” U/G piping, ~10.2Km of 28” CS Pipeline, ~45 MT of structural steel, ~1.2Km of 30” CS Pipeline, and coating of 42” U/G Piping.

Phase 1 System 1, 3 and 4 Modifications. Pipeline install and Wye Switch Installs including installation of ~3km CS sleeves and culverts of various diameters, ~1km of 36” A/G piping, ~ 2.4 km of Road Crossings, ~1.1km of 42” U/G piping, ~10.2Km of 28” CS Pipeline, ~45 MT of structural steel, ~1.2Km of 30” CS Pipeline, and coating of 42” U/G Piping.

Phase 1 System 1, 3 and 4 Modifications. Pipeline install and Wye Switch Installs including installation of ~3km CS sleeves and culverts of various diameters, ~1km of 36” A/G piping, ~ 2.4 km of Road Crossings, ~1.1km of 42” U/G piping, ~10.2Km of 28” CS Pipeline, ~45 MT of structural steel, ~1.2Km of 30” CS Pipeline, and coating of 42” U/G Piping.

LNG Tank Module Assembly Project
Primoris Canada conducted varying degrees of module receipt...
Alberta, Canada

LNG Tank Module Assembly Project

Varying degrees of module receipt and assembly including heavy lift, placement, interconnection and permanent anchoring. It also includes the field fit, assembly, welding and pressure testing of the piping systems connecting to newly constructed Full Containment Liquid Natural Gas Tank, supporting the client with material receiving and preservation activities and supporting the client with pre-commissioning, commissioning and Mechanical system turnover at the facility, located at a site in Kitimat, BC.

Varying degrees of module receipt and assembly including heavy lift, placement, interconnection and permanent anchoring. It also includes the field fit, assembly, welding and pressure testing of the piping systems connecting to newly constructed Full Containment Liquid Natural Gas Tank, supporting the client with material receiving and preservation activities and supporting the client with pre-commissioning, commissioning and Mechanical system turnover at the facility, located at a site in Kitimat, BC.

Varying degrees of module receipt and assembly including heavy lift, placement, interconnection and permanent anchoring. It also includes the field fit, assembly, welding and pressure testing of the piping systems connecting to newly constructed Full Containment Liquid Natural Gas Tank, supporting the client with material receiving and preservation activities and supporting the client with pre-commissioning, commissioning and Mechanical system turnover at the facility, located at a site in Kitimat, BC.

TransAlta Keephills Unit 3 Conversion
Primoris Canada supplied fabrication and installation of a...
Keephills, AB, Canada

TransAlta Keephills Unit 3 Conversion

Fabrication and installation of a new natural gas supply & control system to complete the last phase of converting the TransAlta Keephills 3 facility away from coal-fired operations. The new system required the installation of new skid mounted equipment and the replacement of 24 existing burners. Due to the change in fuel source, a portion of the large flu gas ducting needed to be demolished and rebuilt which required use of advanced rigging techniques. Primoris supplied and installed piping, modified existing piping, structural steel and various supports, decommissioned various pieces of equipment, removal / demo of electrical cabling, and instruments. The facility was shut down for 8 weeks to accommodate the burner replacements, connection of the system and ducting modifications. Commissioning support to bring the boiler back online and calibrate the system.

Fabrication and installation of a new natural gas supply & control system to complete the last phase of converting the TransAlta Keephills 3 facility away from coal-fired operations. The new system required the installation of new skid mounted equipment and the replacement of 24 existing burners. Due to the change in fuel source, a portion of the large flu gas ducting needed to be demolished and rebuilt which required use of advanced rigging techniques. Primoris supplied and installed piping, modified existing piping, structural steel and various supports, decommissioned various pieces of equipment, removal / demo of electrical cabling, and instruments. The facility was shut down for 8 weeks to accommodate the burner replacements, connection of the system and ducting modifications. Commissioning support to bring the boiler back online and calibrate the system.

Fabrication and installation of a new natural gas supply & control system to complete the last phase of converting the TransAlta Keephills 3 facility away from coal-fired operations. The new system required the installation of new skid mounted equipment and the replacement of 24 existing burners. Due to the change in fuel source, a portion of the large flu gas ducting needed to be demolished and rebuilt which required use of advanced rigging techniques. Primoris supplied and installed piping, modified existing piping, structural steel and various supports, decommissioned various pieces of equipment, removal / demo of electrical cabling, and instruments. The facility was shut down for 8 weeks to accommodate the burner replacements, connection of the system and ducting modifications. Commissioning support to bring the boiler back online and calibrate the system.

LNG Canada Field-Erected Tanks
Primoris Canada conducted the design, engineering...
Canada

LNG Canada Field-Erected Tanks

Design, engineering, procurement, fabrication, construction, and testing service of three (3) large Tanks at the LNG liquefaction facility and export terminal in Kitimat, BC. Field Erected Tanks include one Condensate Storage Tank (105’ diameter x 60’ height), one HTF Storage Tank (36’diameter x 60’ height), and one Treated Raw Water Holding Tank (100’x 60’ height.) Prefabrication requirements for Manway, Nozzle, and Internal piping self-performed by our fabrication facility. Performed two steel dome roof air raises on the two largest tanks in our scope. Full external coating (all tanks), full internal coating (one tank), and exterior insulation (two tanks).

Design, engineering, procurement, fabrication, construction, and testing service of three (3) large Tanks at the LNG liquefaction facility and export terminal in Kitimat, BC. Field Erected Tanks include one Condensate Storage Tank (105’ diameter x 60’ height), one HTF Storage Tank (36’diameter x 60’ height), and one Treated Raw Water Holding Tank (100’x 60’ height.) Prefabrication requirements for Manway, Nozzle, and Internal piping self-performed by our fabrication facility. Performed two steel dome roof air raises on the two largest tanks in our scope. Full external coating (all tanks), full internal coating (one tank), and exterior insulation (two tanks).

Design, engineering, procurement, fabrication, construction, and testing service of three (3) large Tanks at the LNG liquefaction facility and export terminal in Kitimat, BC. Field Erected Tanks include one Condensate Storage Tank (105’ diameter x 60’ height), one HTF Storage Tank (36’diameter x 60’ height), and one Treated Raw Water Holding Tank (100’x 60’ height.) Prefabrication requirements for Manway, Nozzle, and Internal piping self-performed by our fabrication facility. Performed two steel dome roof air raises on the two largest tanks in our scope. Full external coating (all tanks), full internal coating (one tank), and exterior insulation (two tanks).

Interested in Working With Us? Contact Us.

Fill out the form below for more information on our services.

 
  
  
 
Primoris Canada
 

HEADQUARTERS

28509 96 Avenue
Acheson, AB T7X 6J7
Canada
Phone: 780.400.4200
Fax: 780.400.4290

Find us on a map

 


 
Edmonton Fabrication Office
5104-17 Street
Edmonton, AB T6P 1T6
Canada
Phone: 780.462.3222
Fax: 780.462.3028

Fort McMurray Office
1005 Memorial Drive
Hwy 63 North
Fort McMurray, AB T9K 0K4
Canada
Phone: 780.743.6247
Fax: 780.743.6398

Fleet Office
28509 96 Avenue
Acheson, AB T7X 6J7
Canada
Phone: 780.400.4200
Fax: 780.400.4290