Overview

Primoris Pipeline

Primoris Pipeline is committed to being the value and customer solutions leader in midstream, transmission, and upstream construction by delivering safe, high quality, environmentally-compliant, timely and cost-effective projects for our clients, regardless of size or challenges.

Primoris Field Services

About Us

Our experience and capabilities successfully blend the stability and breadth of a large public company with the functionality and efficiency of a local contractor. We focus on listening to our clients, then provide solutions that meet their needs and exceed their expectations.

We have the ability to efficiently execute multiple projects simultaneously throughout the United States, including:

  • all diameters of mainline construction (up to 48-inch), long (100+ miles) projects
  • pipeline looping and laterals
  • pipeline pick-up and re-lay projects
  • specialty pipeline projects (congested corridors, short replacements, etc.)
  • pipeline facility construction projects
  • pipeline integrity construction and program management

Projects

Phillips 66, La Pryor Pump Station
Primoris Field Services completed the Phillips 66 La Pryor...
La Pryor, TX

Phillips 66, La Pryor Pump Station

Primoris Field Services completed the Phillips 66 La Pryor Pump Station that included the installation of six 6,000 Horse Power Sulzer Pumps, installation of heavy 30-inch diameter pipe, Power Distribution Center Building (weighing 350,000 lbs), launcher/receiver with double block valves, meter station, Manifolds, and DRA.

Primoris Field Services completed the Phillips 66 La Pryor Pump Station that included the installation of six 6,000 Horse Power Sulzer Pumps, installation of heavy 30-inch diameter pipe, Power Distribution Center Building (weighing 350,000 lbs), launcher/receiver with double block valves, meter station, Manifolds, and DRA.

Primoris Field Services completed the Phillips 66 La Pryor Pump Station that included the installation of six 6,000 Horse Power Sulzer Pumps, installation of heavy 30-inch diameter pipe, Power Distribution Center Building (weighing 350,000 lbs), launcher/receiver with double block valves, meter station, Manifolds, and DRA.

DCP Midstream, Integrity Digs
Primoris Field Services completed four sections of...
Texas & Oklahoma

DCP Midstream, Integrity Digs

Primoris Field Services completed four sections of Integrity/Anomaly Digs for DCP Midstream. This project consisted of making one calls for each dig site, excavating, coating removal, inspecting, and making repairs at anomaly locations that the ILI tool had identified.

Primoris Field Services has four sections of Integrity/Anomaly Digs for DCP Midstream. This project consists of making one calls for each dig site, excavating, coating removal, inspecting, and making repairs at anomaly locations that ILI tool has identified.

Primoris Field Services has four sections of Integrity/Anomaly Digs for DCP Midstream. This project consists of making one calls for each dig site, excavating, coating removal, inspecting, and making repairs at anomaly locations that ILI tool has identified.

Kinder Morgan, Compressor Station 304 Horsepower Addition
Primoris Field Services completed the Compressor Station...
Marshall, TX

Kinder Morgan, Compressor Station 304 Horsepower Addition

Primoris Field Services completed the Compressor Station Upgrade project for Kinder Morgan. The project included installation of 46,960 additional horsepower (Hp) at the existing Compressor Station 304. The additional horsepower consists of two new 23,470 Hp Solar Titan 130 natural gas fired, turbine driven C75 compressors located on the Gulf Coast Mainline in Harrison County, TX near the city of Marshall, TX. 

Primoris Field Services completed the Compressor Station Upgrade project for Kinder Morgan. The project included installation of 46,960 additional horsepower (Hp) at the existing Compressor Station 304. The additional horsepower consists of two new 23,470 Hp Solar Titan 130 natural gas fired, turbine driven C75 compressors located on the Gulf Coast Mainline in Harrison County, TX near the city of Marshall, TX. 

Primoris Field Services completed the Compressor Station Upgrade project for Kinder Morgan. The project included installation of 46,960 additional horsepower (Hp) at the existing Compressor Station 304. The additional horsepower consists of two new 23,470 Hp Solar Titan 130 natural gas fired, turbine driven C75 compressors located on the Gulf Coast Mainline in Harrison County, TX near the city of Marshall, TX. 

ExxonMobil PII 231 Webster
Primoris Pipeline completed the installation of 15.36 miles...
Pasadena, TX

ExxonMobil PII 231 Webster

Primoris Pipeline completed the installation of 15.36 miles of 36-inch pipeline in Webster, TX. Included in the project scope were 3,100 feet of bores and 30,000 feet of horizontal directional drills.

Primoris Pipeline completed the installation of 15.36 miles of 36-inch pipeline in Webster, TX. Included in the project scope were 3,100 feet of bores and 30,000 feet of horizontal directional drills.

Primoris Pipeline completed the installation of 15.36 miles of 36-inch pipeline in Webster, TX. Included in the project scope were 3,100 feet of bores and 30,000 feet of horizontal directional drills.

Plains All American Wink to Webster
Primoris Pipeline completed the installation of an 88-mile...
Wink, TX

Plains All American Wink to Webster

Primoris Pipeline completed the installation of an 88-mile, automatically welded 36-inch pipeline in West Texas. Included in the project scope were 10,322 feet of bores and 9,131 feet of horizontal directional drills.

Primoris Pipeline completed the installation of an 88-mile, automatically welded 36-inch pipeline in West Texas. Included in the project scope were 10,322 feet of bores and 9,131 feet of horizontal directional drills.

Primoris Pipeline completed the installation of an 88-mile, automatically welded 36-inch pipeline in West Texas. Included in the project scope were 10,322 feet of bores and 9,131 feet of horizontal directional drills.

Philips 66 C2G Project
Primoris Pipeline completed the installation of 155 miles of...
Brazoria County, TX

Philips 66 C2G Project

Primoris Pipeline completed the installation of 155 miles of 16-inch ethane pipeline along the Texas Gulf Coast. Included in the project scope were 20 mainline valves, 23,122 feet of bores, and 69,630 feet of horizontal directional drills. This project had over 1,000,000 safe man-hours with a TRIR of 0.00.

Primoris Pipeline completed the installation of 155 miles of 16-inch ethane pipeline along the Texas Gulf Coast. Included in the project scope were 20 mainline valves, 23,122 feet of bores, and 69,630 feet of horizontal directional drills. This project had over 1,000,000 safe man-hours with a TRIR of 0.00.

Primoris Pipeline completed the installation of 155 miles of 16-inch ethane pipeline along the Texas Gulf Coast. Included in the project scope were 20 mainline valves, 23,122 feet of bores, and 69,630 feet of horizontal directional drills. This project had over 1,000,000 safe man-hours with a TRIR of 0.00.

 

HEADQUARTERS

Houston Office
14455 Primoris Way
Houston, TX 77048
Phone: 281.431.5900
Fax: 281.431.6881

Beaumont Office
9025 Blewett Road
Beaumont, TX 77705
Phone: 409.794.9995
Fax: 409.750.7222

Find us on a map


Freeport Office
2165 FM 523
Oyster Creek, TX 77541

Victoria Office
201 Anthony Road
Victoria, TX 77901

Fort Worth Office
9001 Primoris Court
Ft. Worth, TX 76140
Phone: 469.484.5811
Fax: 817.568.4155

Denton Office
6831 North I-35 Frontage Road
Denton, TX 76207
Phone: 469.731.3607

Midland Office
8901 FM 307
Midland, TX 79706

Carlsbad Office
4117 Grandi Rd
Carlsbad, NM 88220

Tulsa Office
15711 East Skelly Drive, Bldg B
Tulsa, OK 74116