Overview

The Contractor of Choice

Primoris Water & Mechanical is comprised of two groups with offices throughout Florida, Texas, and North Carolina. Our Mechanical group serves the niche market of installing underground hydronic piping (chilled water, hot water, steam, and condensate) systems. We service a wide variety of Universities, Hospitals, and Private Companies across Texas, Louisiana, and surrounding areas; as well as the Carolinas and the broader southeast region. We have built a reputation as a high-risk excavation specialist as sophisticated shoring systems are often necessary to allow the installation hydronic systems around existing utilities and buildings. Additionally, we also assist owners, engineers, and general contractors with value engineering hydronic system designs to ensure that they have both economical and efficient systems. Our Water group constructs water, wastewater, and reclaimed water treatment facilities throughout Florida and Texas with offices in Manatee, Lee, Broward, Miami-Dade, and Palm Beach counties in Florida as well as Houston, TX. We have been in business for over 30 years delivering construction and rehabilitation projects of water and wastewater treatment facilities through Design-Build, Design-Bid-Build and Construction Management at Risk contracts.

Primoris Water & Mechanical

About Us

Primoris Water & Mechanical is comprised of two groups with offices throughout Florida and Texas.

Our Mechanical group serves the niche market of installing underground hydronic piping (chilled water, hot water, steam, and condensate) systems. We service a wide variety of universities, hospitals, airports, and private companies across the southern United States. We have built a reputation as a highly skilled excavation specialist, as sophisticated shoring systems are often necessary to allow the installation hydronic systems around existing utilities and buildings. Additionally, we also assist owners, engineers, and general contractors with value engineering hydronic system designs to ensure that they have both economical and efficient systems.

Our Water group constructs water, wastewater, and reclaimed water treatment facilities throughout Florida and Texas with offices in Manatee, Lee, Broward, Miami-Dade, and Palm Beach counties in Florida as well as Houston, TX. We have been in business for over 30 years delivering construction and rehabilitation projects of water and wastewater treatment facilities through Design-Build, Design-Bid-Build and Construction Management at Risk contracts.

Projects

Sawgrass WWTP Reuse Facility
The City of Sunrise conducted a Reuse Feasibility Study that...
Sunrise, FL

Sawgrass WWTP Reuse Facility

The City of Sunrise conducted a Reuse Feasibility Study that determined a reuse water treatment facility would provide a solution to regulatory and customer needs. Based on this finding and other subsequent studies, Primoris Water & Mechanical constructed a 2MG expandable reuse side stream secondary effluent to tertiary reuse standards. This new reuse facility was constructed adjacent to the Sawgrass utilities water and wastewater. 

The City of Sunrise conducted a Reuse Feasibility Study that determined a reuse water treatment facility would provide a solution to regulatory and customer needs. Based on this finding and other subsequent studies, Primoris Water & Mechanical constructed a 2MG expandable reuse side stream secondary effluent to tertiary reuse standards. This new reuse facility was constructed adjacent to the Sawgrass utilities water and wastewater. 

The City of Sunrise conducted a Reuse Feasibility Study that determined a reuse water treatment facility would provide a solution to regulatory and customer needs. Based on this finding and other subsequent studies, Primoris Water & Mechanical constructed a 2MG expandable reuse side stream secondary effluent to tertiary reuse standards. This new reuse facility was constructed adjacent to the Sawgrass utilities water and wastewater. 

Charlotte Douglas International Airport Project
Primoris Water & Mechanical worked on the Charlotte Douglas...
Charlotte, NC

Charlotte Douglas International Airport Project

Primoris Water & Mechanical worked on the Charlotte Douglas International Airport project installing a turnkey utility corridor including chilled and hot water piping, telecommunications duct bank, and all related site work. The team completed the final auger bores under road crossings. Once the critical phases on Rental Car Rd and the airport’s loading dock were substantially complete, the final focus was piping tie-ins; testing and flushing; and startup and restoration.

Primoris Water & Mechanical worked on the Charlotte Douglas International Airport project installing a turnkey utility corridor including chilled and hot water piping, telecommunications duct bank, and all related site work. The team completed the final auger bores under road crossings. Once the critical phases on Rental Car Rd and the airport’s loading dock were substantially complete, the final focus was piping tie-ins; testing and flushing; and startup and restoration.
Primoris Water & Mechanical worked on the Charlotte Douglas International Airport project installing a turnkey utility corridor including chilled and hot water piping, telecommunications duct bank, and all related site work. The team completed the final auger bores under road crossings. Once the critical phases on Rental Car Rd and the airport’s loading dock were substantially complete, the final focus was piping tie-ins; testing and flushing; and startup and restoration.
New Parkland Hospital Cup Site Distribution Project
This project included the installation of approximately 7060...
Texas

New Parkland Hospital Cup Site Distribution Project

Installation of approximately 7060 linear feet of piping in multiple systems including chilled water, hot water, steam, condensate, domestic water, and softened cold water. A variety of pipe materials were used including pre-insulated standard weigh pipe, pre-insulated extra heavy pipe, ductile iron, and PVC.

Installation of approximately 7060 linear feet of piping in multiple systems including chilled water, hot water, steam, condensate, domestic water, and softened cold water. A variety of pipe materials were used including pre-insulated standard weigh pipe, pre-insulated extra heavy pipe, ductile iron, and PVC.
Installation of approximately 7060 linear feet of piping in multiple systems including chilled water, hot water, steam, condensate, domestic water, and softened cold water. A variety of pipe materials were used including pre-insulated standard weigh pipe, pre-insulated extra heavy pipe, ductile iron, and PVC.
Optimization & Improvements D/B Services
This Design-Build Services agreement provides a mechanism...
Palm Beach, FL

Optimization & Improvements D/B Services

This three-year Design-Build Services agreement provides a mechanism for Palm Beach County to fast-track design and construction for water, wastewater and reclaimed water projects at any of the various county-owned treatment facilities. This contract includes the design and construction of the following systems: chemical feed systems for lime and fluoride; sulfuric acid dilution system; reverse osmosis cleaning and permeate flush systems; finished water storage tank aeration & mixing improvements; temporary bypassing and valve replacements; automation and process improvements; 700hp multistage centrifugal blower for aeration; replacement of existing sluice gates and slide gates; structural and process modifications to headworks; and deep injection monitoring well.

This three-year Design-Build Services agreement provides a mechanism for Palm Beach County to fast-track design and construction for water, wastewater and reclaimed water projects at any of the various county-owned treatment facilities. This contract includes the design and construction of the following systems: chemical feed systems for lime and fluoride; sulfuric acid dilution system; reverse osmosis cleaning and permeate flush systems; finished water storage tank aeration & mixing improvements; temporary bypassing and valve replacements; automation and process improvements; 700hp multistage centrifugal blower for aeration; replacement of existing sluice gates and slide gates; structural and process modifications to headworks; and deep injection monitoring well.
This three-year Design-Build Services agreement provides a mechanism for Palm Beach County to fast-track design and construction for water, wastewater and reclaimed water projects at any of the various county-owned treatment facilities. This contract includes the design and construction of the following systems: chemical feed systems for lime and fluoride; sulfuric acid dilution system; reverse osmosis cleaning and permeate flush systems; finished water storage tank aeration & mixing improvements; temporary bypassing and valve replacements; automation and process improvements; 700hp multistage centrifugal blower for aeration; replacement of existing sluice gates and slide gates; structural and process modifications to headworks; and deep injection monitoring well.
SMU Pursuit Project
Primoris Water & Mechanical began installing chilled water...
Dallas, TX

SMU Pursuit Project

Primoris Water & Mechanical began installing chilled water, steam, and condensate distribution systems for a campus expansion at Southern Methodist University in Dallas, Texas. The piping was installed via a combination of auger boring and open-cut excavation. 

Primoris Water & Mechanical began installing chilled water, steam, and condensate distribution systems for a campus expansion at Southern Methodist University in Dallas, Texas. The piping was installed via a combination of auger boring and open-cut excavation. 
Primoris Water & Mechanical began installing chilled water, steam, and condensate distribution systems for a campus expansion at Southern Methodist University in Dallas, Texas. The piping was installed via a combination of auger boring and open-cut excavation. 
UTEP Campus Transformation Project
This project consisted of installing approximately 10,500...
Texas

UTEP Campus Transformation Project

This project consisted of installing approximately 10,500 linear feet of hydronic piping. Pipe systems included DR11 HDPE chilled water lines varying in sizes between 3-inches to 24-inches and scheduled 80 carbon steel double jackets high-temperature hot water lines varying in sizes between 2-inches and 8-inches. Trench depth varied from 4 feet 6-inches to 7 feet.

This project consisted of installing approximately 10,500 linear feet of hydronic piping. Pipe systems included DR11 HDPE chilled water lines varying in sizes between 3-inches to 24-inches and scheduled 80 carbon steel double jackets high-temperature hot water lines varying in sizes between 2-inches and 8-inches. Trench depth varied from 4 feet 6-inches to 7 feet.
This project consisted of installing approximately 10,500 linear feet of hydronic piping. Pipe systems included DR11 HDPE chilled water lines varying in sizes between 3-inches to 24-inches and scheduled 80 carbon steel double jackets high-temperature hot water lines varying in sizes between 2-inches and 8-inches. Trench depth varied from 4 feet 6-inches to 7 feet.
Wastewater Reclamation Facility Design/Build
Primoris Water & Mechanical worked on a Design/Build...
Florida

Wastewater Reclamation Facility Design/Build

Primoris Water & Mechanical worked on a Design/Build expansion of the WWRF to a permitted capacity of 10.5 MGD on an AADF. The scope of work included a new aeration basin, modifications to the existing 4 aeration basins, modifications to the existing blower building, a new clarifier, modifications to the existing sludge pumping station, a new injection well pump, and replacement of the existing plant PLC network.

Primoris Water & Mechanical worked on a Design/Build expansion of the WWRF to a permitted capacity of 10.5 MGD on an AADF. The scope of work included a new aeration basin, modifications to the existing 4 aeration basins, modifications to the existing blower building, a new clarifier, modifications to the existing sludge pumping station, a new injection well pump, and replacement of the existing plant PLC network.
Primoris Water & Mechanical worked on a Design/Build expansion of the WWRF to a permitted capacity of 10.5 MGD on an AADF. The scope of work included a new aeration basin, modifications to the existing 4 aeration basins, modifications to the existing blower building, a new clarifier, modifications to the existing sludge pumping station, a new injection well pump, and replacement of the existing plant PLC network.
 

HEADQUARTERS

Mechanical
14455 Primoris Way
Houston, TX 77048
Phone: 346.352.5200
Email: [email protected]

 
Water
13794 NW 4th Street, Suite 200
Sunrise, FL 33325
Phone: 941.377.8555
Email: [email protected]
Find us on a map


 
Additional Water Division Locations:

4744 East State Route 64
Bradenton, FL 34208

9240 Bonita Beach Road
Suite 3309
Bonita Springs, FL 34135

580 Village Boulevard
Suite 325
West Palm Beach, FL 33409

 
Additional Mechanical Division Locations:

3809 Beam Road
Suite L
Charlotte, NC 28217